Case Studies
Outstanding projects highlighting services design and operation
Striving for net zero at Foster+Partners’ Battersea HQ
After metering its Battersea HQ, Foster + Partners found that IT, lighting and small power made up a significant proportion of the energy used in…
Generation gains: designing a 5th generation energy network in central London
Bankside Yards is set to become the UK’s first major mixed-use regeneration project with zero emissions in operation. Phil Lattimore looks at the fifth-generation ambient energy network…
Case study: Edge Suedkreuz offices in Berlin
The striking Edge Suedkreuz office development in Berlin required a space-defying chilled beam system design that met the building’s exacting ventilation, cooling and heating demands. Andy Pearson reports
Case study: Battersea Power Station
Battersea’s iconic power station has reopened as a mixed-use development incorporating an innovative services strategy that removed the need for heating and cooling in the…
Case study: Houlton School retrofit
Turning a radio transmitter station into a sustainable new school for Rugby involved vastly improving the historic fabric of the building while designing new teaching…
Riding high: Dubai’s indoor rollercoaster
An effective air condition system was essential to making the Storm indoor rollercoaster viable in Dubai’s desert environment. Andy Pearson explains how Cundall minimised cooling…